New contract.

Only flying gets you higher.

29.04.2016 - New contract: A powerful state-of-the-art passenger transport system (PTS) is required at Frankfurt Airport to connect the planned new terminal 3 in the south to the the northbound existing terminals 1 and 2 including the attached rail-way stations. 

The northern section of this PTS has to be placed on elevated level right above of existing structures and operating areas.

We are very delighted to have been awarded the contract for this demanding civil and structural engineering task.