Passenger Transport.

Building start: New PTS at Frankfurt Airport.

07.09.2018 - Start of the building works for the infrastructure of the new people-mover system (passenger transport system - PTS) at Frankfurt Airport. The first steps inlude the clearing of the building site as well as the preparing of the site facilities. 

The new line will link the northbound existing terminals 1 and 2 including the attached rail-way stations to the planned new terminal 3 in the south of the airport. Opening of the complete system is slated for 2023. The northern section of this PTS has to be placed on elevated level right above of existing structures and operating areas. The planning services for this section are provided by our company, INGENIEURBÜRO DR. BINNEWIES.